Sunday, January 5, 2014

Q4 FAL list for 2013!

It has been way too hot here to do much sewing but I have a late finish for the Q4 FAL - this is a mug rug that I made from a selection of black and white fabrics.

Once again, I used the scrappy trip along tutorial to make this block, but started with strips 12.5 x 2 inches wide so the mug rug finished at 9.5 inches square.

I backed it in some newspaper print fabric and have sent it off along with a block of dark chocolate as a gift.
 So this little project rounds out my list of finishes for the Q4 FAL.
she can quilt

I managed to get 9/10 projects done from my original list back in October 2013 which I am pretty pleased about considering I had my husband home for a few weeks after ankle surgery:(
1. An  "Owl You Need" sewing buddy: done!
2. Fabric Basket for swap:done!
3. DUDQS Mini quilt: done!
4. DUDQS Xmas runner:done!
5. Black and white project; done (see above)!
6. Feathers quilt: unfortunately this pile of lovely blocks was not touched this quarter but is first on my list for next time!
7. Ellie Quilt (aka Baby Elephant walk quilt): done!
8. Chicopee QAYG bag: done!
9. Christmas stocking: done!
10. Millefiore fabric projects: done!
A huge thanks to Leanne and her wonderful sponsors for hosting the FAL and keeping us all on track:) 
Finish Along 2014
I will definitely be joining in the FAL again with Katy @ The Littlest Thistle this year!
Kirsten.

6 comments:

  1. you did very well with all your finishes xx

    ReplyDelete
  2. Wow, you did really well, looking forward to seeing what you make in 2014 :o)

    ReplyDelete
  3. Wow! That is an impressive finish! Love the Chicopee bag the best!

    ReplyDelete
  4. You have done so well with your finishes and each one is beautiful.

    ReplyDelete
  5. OMG! I am hanging my head in shame reading this. I am such a slacker!

    ReplyDelete
  6. 2013 certainly was a very productive year for you. I hope you really enjoy all the projects you work on this year.

    ReplyDelete