I had good intentions of doing lots of sewing but due to very hot weather over summer, only managed to actually finish a few of the projects on my Q1 proposed list of finishes.
1. Abstract Elephant quilt: still no further progress.
2. AMH Painted Portrait dress: done!
3. Baby Animals quilt: done!
4. Butterfly quilt by Tula Pink - I have been saving my Eden bundle for this to do a different version of this amazing quilt.
5.Cloud 9 Plus quilt: thinking of doing a different design for this one....
6. Coastal ripples blanket: no further progress.
7. Colorway quilt: done!
8. Liberty Fancy Foxes quilt: done!
9. Matilda/Melba Swoon quilt: all of the blocks are made but still need to finish the quilt!
10.Necessary Wallet Clutch (NCW) : done!
11. Plus Squared quilt: done!
12. Summerlove Swoon Sixteen: didn't get a chance to start this one:(
13.Tula hexie quilt: no progress.
14. World travel wallet: no further progress.
So only 6/14 this time - hoping for a more productive Q2! Linking up with the 2017 FAL team.
Kirsten.
14 projects is quite a daunting task Kirsten so to get nearly half done is still an achievement! Quilts,accessories and a dress, Well done!
ReplyDeleteSix finishes is amazing! Good job!
ReplyDeleteStill six terrific finishes!!
ReplyDeleteYou still managed a lot of finishes! Well done! On behalf of the 2017 global FAL hosts, thank you for participating in thi s quarter's FAL.
ReplyDelete